On the construction supervision of civil engineering construction applications
[Abstract] In this paper, work experience, combined with Engineering analysis of the supervision of construction in the Engineering, supervision and the need to strengthen management, and overall quality control Engineering, for reference!
[Keywords] Civil works, supervision; foundation construction, the main construction, management points
A pre-construction preparation
Drawing Mixed 1.1 strict customs, and actively organize the construction, design, supervision of professional and technical staff together for joint hearing drawings present the shortcomings of joint trial work there is: water, electricity, Civil Engineering group after the joint hearing summary, the joint hearing between the lack of professional and construction units of construction, installation divided the total work without the technical director of the overall checks, the design unit in accordance with professional graphic design, lack of professional review. All units should arrange technical person in charge of drawing Mixed strictly on the basis of this review.
1.2 building, structure, drainage, fire drawings drawing Mixed review submissions and comment in the corresponding summary of the contents of construction plans, to avoid rework caused by the construction of missing the event.
The basis of the construction phase 2
2.1 According to the design and owners to determine the elevation of + -0.000, timely nuclear drainage, fire protection system piping elevation and whether the existing site elevation permafrost depth, so this is not for review to the drainage system caused by cold.
2.2 raft foundation, the construction of the base steel banding should be notified when the installation team for grounding device construction, review of grounding devices are correct, construction installation supervisors to co-sign it before pouring.
2.3 Prior to the basement wall formwork construction, the construction units and report to the trial selection and installation of sub-units of unit approach to avoid such as ventilation systems and construction with underground map is not marked hole, and determined the ventilation unit construction, pouring and found Ventilation openings not to allow such an embarrassing situation.
2.4 to seriously review the electrical line pipe, drainage outlets, water is the entry level consistent with the drawings and check whether it meets the requirements set casing, fixed it firmly, with the consent and installation supervision of Civil engineer consent before allowing the mold and pouring, and asked to team writing tests, to strengthen the protection of the installed nozzle.
2.5 implementation + -0.000 Mixed Slab floor system to avoid drainage, sanitary ware and building location in the plane contradiction. + -0.000 Slab drainage should be checked before pouring riser position and ventilation ducts, windows, construction of the upper beam and the perception, whether the door position sanitary ware, electrical switches, sockets contradicts the position of the switch is easy to use (with The design of the door position switch), water pipes and heating, drainage channels influence each other, so that pre-control, easy to use and beautiful to meet the principle.
2.6 Slab laying electrical wire in the tube should be with the Civil construction, electrical conduit can not be located after the banding caused by the electrical line pipe steel parts of steel protective layer and reduced cross-section force in the tube should be checked at the top of dense steel mesh set prevent the slab crack. girder bottom of the pipe laying electrical wire steel beam position can not be destroyed, if the impact of installing the electrical conduit to avoid the beam reinforcement should be laid to avoid the force structure affected.
3 of the main construction phase
3.1 floor flat in a timely manner requires the construction unit to do after the installation of a model room, bathroom, kitchen, check whether the drainage branch pipe elevation windows with Civil conflict, whether the impact of ceiling lighting and if the installation affect the use of professional conflicting functions, and timely contact design treatment.
3.2 Check electrical line pipe laying on the location of the impact of structural steel and civil construction workers on the installation of tube protection.
3.3 In the wall construction, should notify the installation of units do equipotential ground, by an electrician to do with the civil construction, to prevent the omission resulting in rework.
3.4 frame finished slab steel banding, supervision of the construction side electrical grading ring construction, the construction of correct investigation of reinforced random electrical construction workers welding practices to ensure the quality of the reinforced structure.
3.5 In line with the wall construction, electrical construction personnel should be required in the main construction steel in the ground set aside at the first column to the ground wall construction, to avoid secondary effects of construction on the structure.
3.6 In the light junction box is not checked before setting hidden location, location is not correct promptly notify the adjustment.
3.7 monitor electric wells, tube wells, front room, bathroom, kitchen, etc. nozzle hole casing set aside, and does not destroy the concrete reaches a certain strength from the time out to strengthen the construction of concrete product protection.
3.8 switch, outlet location of the households within the bias control in 5mm Check switch installation where there is not easy to use, found that super-bias and inconvenient to use, the supervisors should be able to request adjustments to eliminate the perception of defects.
3.9 The brick masonry, the requirements of the electrical junction box out of the wall 1.5 ~ 2cm, in order to ensure consistency with the decorative surface layer thickness to control perception of quality, with good electrical and civil Engineering work.
3.10 Check the fire box, the exhaust hole of the plane position size is consistent with the installation diagram, if the conflicting contact design solutions.
3.11 should prevent construction (installation) works to change the design change does not reflect the installation (civil engineering) to change the content, you should consider the impact of changes in between, to avoid construction accidents. Links to free download http://www.hi138. com
3.12 circulated to implement design changes to the system. Construction, installation personnel have read and copied at the sign design, specifying the date, source, transcripts and names of people, if the change in time to the project officers known to change the content.
4 roof construction phase
Supervision of construction with the installation of 4.1 do Gully, snorkel, airway leaving in and do the detail around the water nozzle.
4.2 Install roof lightning rod, lightning network, air barrier and other work, civil engineering should be provided with the elevation to ensure the perception of quality.
4.3 Civil Engineering fan base does not appear to be carefully installed to view maps, beams and roof water tanks set between the tank base map device are consistent.
4.4 elevator machine room roof due to electrical power lines are often well sealed and the lack of a design mark. If a similar phenomenon in the civil construction elevator machine room before the positive contact design process.
5 decoration, installation and construction phase
5.1 pairs of pipe installed up the mouth of the block system, requiring the construction in two to fill. First waterproof powder mixed with fine aggregate concrete pouring 1 / 3, etc. after the initial setting for the second pouring, to prevent water seepage.
5.2 Decoration Engineering prior to the construction of a block to clear the electrical conduit, to prevent construction of the wall decoration, on the ground as the electrical conduit closure after the rework.
5.3 Supervision of civil construction and technical personnel to install the drain line elevation to provide control to ensure proper elevation of the floor drain.
5.4 installed before construction, require the installation and civil construction and technical personnel have been installed to determine a good direction, elevation, coordinates timely review.
5.5 requires the laying of the ground before pouring water, heating pipe pressure, under pressure pouring installed next to the station staff to carry out and found relief in a timely manner to be replaced; requirements of civil construction workers laying pipe to cover the protection with the work.
5.6 installation bathroom equipment, plumbing before, requiring the construction side of the installation team to conduct technical tests and do wall tiles finished construction protection.
5.7 units of construction with the installation of the elevator, the elevator to provide elevation and positioning of Actinobacillus review. Actinobacillus avoid bias resulting in positioning the elevator elevator door on the ground varies in width, affecting the perception of the losses.
5.8 construction wall decoration for the ceiling finishing projects, you can install the electrical equipment, supervision should be strict procedures, supervision of construction do switch, junction box and other peripheral gap treatment, to ensure the quality of perception.
5.9 required to do construction after squatting to live on the floor nozzle set, with the installation, easy maintenance and replacement water supply branch pipe.
5.10 bathroom, kitchen, laying on the ground the dark water, heating pipes, the installation should do a good job with the construction of the waterproof layer of protection, well construction and nozzle detail around the room four waterproof.
5.11 before the construction of the ventilation system, should pay attention to air duct through the floor, wall coordinates the review of the work. As inconsistent with civil engineering, drawings and promptly correct the error.
5.12 ceiling installation requires heating, hot water pipe insulation after the completion of construction. If there is no design insulation, pipe insulation should be the proposed increase in time to prevent condensation Mizuochi to ceiling.
5.13 Supervision of the installation do the total package of management and coordination unit work (mechanical transport, power supply, the provision of face, etc.) to promote progress.
6 outdoor pipe network construction phase
6.1 ensure that the system construction with the installation depth to meet the requirements, control of inspection wells, septic tanks, nozzle elevation and aspect of the right.
6.2 taking into account the maintenance factor, the proposed outdoor Jianlou ditch construction, maintenance should be set well.
6.3 to be installed sub-team of the project inspection and acceptance and, after laying the whole pipeline system, civil construction workers in order to backfill to prevent rework incidents.
6.4 Install a good job with the civil outdoor fire inspection wells, heating into the mouth, to the wells, sewage wells, water wells set up to prevent the omission of affect system operation to happen.
7 stages of completion and acceptance
7.1 units of time required to bring together the total package installed sub-units of technical information.
7.2 Organization of the professional individual acceptance (elevators, fire, air defense, power distribution room), with corrective construction to project completion and acceptance to provide a prerequisite.
7.3 Supervision Department to organize the pre-inspection, each with a sound installation construction rectification, so that product protection, engineering end of the show clear. With the installation and civil construction is a complex task, as described above is just my personal experience in the work that Strengthen the construction of civil engineering and installation coordination, will effectively ensure the overall quality and safe use of engineering functions, but also the construction cost-effective measures to reduce the side. supervision departments should strengthen supervision and management of this work, so that further increase the level of project management to ensure the supervision of project quality. Links to free download http://www.hi138.com
Newest Research Papers
- Newest
- Engineering Construction Papers
- The rise of the Internet era to create a large network of integrated marketing value
- Chinese students in English language writing negative transfer network to write papers analyzing _ _ net _ to write thesis papers Network
- Chinese students' English pronunciation problems On
- On the "Wuthering Heights"
- On building a culture of three sources of English and American Literature Literature Teaching Corpus improve
- Anglo-American literature on the characteristics of the strange language
- American Literature on the College English curriculum
- On the teaching of English and American Literature on film and literature interaction
- On the Anglo-American literature class on the social and cultural background knowledge in the import
- On the Anglo-American literature in the vague language of the translation strategies
- Anglo-American literature on the reform of teaching in the multimedia
- On the Multimedia in the Teaching of English and American Literature
- Carried out on university English classroom teaching of English and American Literature and challenges the status quo
- Analysis of critical discourse on the Teaching of English and American Literature courses
- On teaching English and American Literature in English in an important position papers to write network _
MOST POPULAR Engineering Construction Papers
- 24Hours
- 7Days
- 30Days
- How to write a research paper?
- About bracket theory in vocational English Listening Teaching
- To explore the Chinese language and literature courses to build network to write papers _
- On the Multimedia in the Teaching of English and American Literature
- On building a culture of three sources of English and American Literature Literature Teaching Corpus
- Interview must be conscientious about
- United States International Development Strategy Analysis of Higher Education
- About Metropolis news magazine of the operation planning
- On the "Wuthering Heights"
- On the new media era newspaper editor's role
- Carried out on university English classroom teaching of English and American Literature and challeng
- Stressors on ICU nurses and Countermeasures
- Students on full play the main role in the teaching of English
- About Vocational School of Health to develop education and training
- Amy Tan novel about mother-daughter relationship between culture _ paper to write network
- About bracket theory in vocational English Listening Teaching
- Hangzhou guide the work on the practice patterns of family education
- On the new curriculum of high school language teaching
- On Quju "lone elm house"
- On how sports psychology in the formation of child health
- Treatment of cervical scraping rubbing on back muscle strain of the clinical experience
- On the secondary school mathematics teaching poor students into thinking about the problem
- Stressors on ICU nurses and Countermeasures
- Students on full play the main role in the teaching of English
- About Vocational School of Health to develop education and training
- How mathematics teaching in primary schools to implement quality education
- Psychological Contract Perspective counselor burnout causes and Countermeasures
- Amy Tan novel about mother-daughter relationship between culture _ paper to write network
- About bracket theory in vocational English Listening Teaching
- On patients in rural junior high school chemistry experiment on the use of resources
- On the water project's construction cost control measures On the _ papers to write network