With regard to the remote mountainous rural power line loss management thinking

After twelve rural power project and expansion of domestic demand reform to improve the power grid security standards for energy efficiency and reduce loss and create the conditions of work, but in remote mountainous rural areas due to the implementation of the power grids by the funds, the special geographical and climatic conditions and other multi-factors, a new round of rural power network to be upgraded further to carry out scientific, technological standard, a considerable part of the remote mountain village far, no net change to cause management to some extent out of line, resulting in the actual line loss and theoretical line losses there is a big gap between the direct impact of the economic efficiency of enterprises, therefore, must be in remote mountainous areas of loss reduction and management from a technical loss reduction loss reduction in two ways, technology is the basis of loss reduction, management, loss reduction is the key.

An enhanced power management
Distribution system for the remote mountainous rural areas are no-load transformer during the day and the actual running, in the daily business management, the strengthening of the transformer load test of time and monthly power supply, the annual electricity supply statistics, analysis in ensure power quality and can withstand the maximum load of the premise, as far as possible to improve the transformer load factor, reducing distribution transformer load loss.

As the mode of production, lifestyle and other reasons, people in remote mountainous rural areas electricity load concentrated in the evening between 19:00 to 22:00, for this situation, the Bureau actively organize and guide the farmers during the day for the processing of agricultural products , to avoid the evening peak hours, not only improve the economic operation of transformer utilization, agricultural improvement and effective relief after a sharp increase in load due to the emergence of "small horse-drawn carts," caused by conflicts, reducing distribution transformer no-load caused by The 10kV distribution losses.

2 installation of reactive power compensation equipment
For the actual remote mountainous areas, in recent years, Wu Shannong electric Authority in accordance with "overall planning, rational layout, dispersion compensation, local balance" principle, in considering the large amount of users to install capacitors to control by the electrical power factor above 0.85, while , focused on the secondary substation to compensate, reduce power loss and front-line reactive power load and reactive power loss.

3 the implementation of seals and seal clamp centralized management
All power supply by the Bureau of the queue number, made uniform and equipped with sealing clamp and seal. For power users, specially equipped with a number of disposable seals. Worked a <<powered by sealing clamp and seal Consuming way>> and the corresponding job ticket system. norms from the collection, use, inspection, handed over the entire process. both to ensure "said the pole" is accurate, but also to eliminate some unhealthy practices.

4 active promotion of rural power grids in remote mountainous areas typical engineering design
Mountainous rural network in order to ensure economic operation, to achieve the best Energy Conservation purposes. Local conditions, we have chosen some typical transformer station, a typical high-voltage lines published in book form, as a standard to be promoted. Saving investment, optimize grid layout, to avoid an unreasonable loss, so that a small input and large output.

5 to crack down on stealing the wind
Most are in remote mountainous rural youth work experience, learn a point outside the IEC, and because of economic difficulties, home from home on the farm power from the brain, stealing each other teach, "the tips", stealing each other to teach "skills", such as the hook with a pair of loose woman as a tool to connect the overhead line, one shoe has a certain weight, connection stability, and second off very easy, with a long stick to pick under it.

In addition, the mountain is generally little stranger, electrical village is a major event, as everyone knows, that electrical inspection tipping off each other. Resulting in greatly increased the difficulty of investigation, especially busy season or drought this end, Wu Shannong year round anti-theft electrical Bureau large survey of business electricity, electricity inspection teams set up, the power of the corresponding audit unit was established, efforts to increase Stealing business survey, the responsibilities to the people. special inspection combined with a comprehensive inspection, investigation and inspection points total table tables, users with appearances, taking a variety of analytical methods, a variety of technical means, to combine various forms of combining the principles, to crack down on the stealing behavior.

6 to carry out tree work Wrecker
In recent years, the implementation of National Forest, the country, but the operation and maintenance of the power grid caused some inconvenience, vigorous growth of trees in remote mountain areas, some trees touching lines, leakage current rainy weather encountered very serious and endanger the safe operation and personal lines security, so the council attaches great importance to inspect the line, touch the line of trees cut down in time to keep the line channel, reducing current leakage, reduce line losses.

7 strengthen the protection of power facilities
On the surface, protection of power facilities has no direct impact on line losses, but in fact has a great relationship. If the protection of power facilities can not be put in place, and that transformer station, power lines and other facilities will be seriously threatened, but will also cause scissors cutting line clean-up difficulties, private pull random access is serious, and even whether it is technical line losses, line losses will be invisible in the management of increased Links to free download http://www.hi138.com
Past two years, Wu Shannong power bureau seriously implement the "village film package, the village package segment, family package bar" of power facilities protection mode, not only improve the awareness of protecting the majority of users in rural areas, the protection of power facilities so that they become a conscious action and an objective to promote the line loss of down.

8 phased implementation, collaboration

The actual view from the current, power loss reduction in remote mountainous rural areas of work can not be achieved, it is a long term, we need to continuously improve the arduous task, so to develop a long-term loss reduction plan, a phased implementation. More need collaboration between various departments within the enterprise, and social support in order to block a variety of run, run, drip, leak, damage, and only concerted efforts to reduce the line losses to a minimum.